Electrical Design, Earthing and Lightning Protection in Bangladesh

Electrical and lightning safety covers the parts of a building's power system that prevent fires and electric shock: accurate single line and layout drawings, correctly rated sub-stations and distribution boards, a low-resistance earthing system and lightning protection designed to IEC 62305. Factories facing RSC or buyer audits usually need all four documented and tested.

Most electrical fires in factories trace back to something that was never designed: a panel added without a drawing, a breaker sized by guesswork, an earth pit nobody can find. We start from the drawings, then build or upgrade the sub-station and distribution boards, install earthing and lightning protection, and test everything before handover. Design follows BNBC 2020 Part 8 and the relevant IEC standards, with ABB or Schneider switchgear where specified. One team owns the job from survey to test report.

At a glance

Standards
BNBC 2020 Part 8, IEC 60364, IEC 61439, IEEE 80, IEC 62305, NFPA 70B
Services
SLD & ELD drawings · Sub-station & MDB/SDB · Earthing system · Lightning & surge protection
Where
Chattogram, Dhaka, Gazipur, Narayanganj

Services

Services under Electrical & Lightning Safety.

Which electrical service do you need?

Start from the problem you need to solve; most electrical audit findings map to one of these.

SLD & ELD drawingsBest for: Missing or outdated drawings, audit findings, new connections and expansionsHow: We trace every panel and circuit on site, then draw the SLD and layouts
Sub-station & MDB/SDBBest for: New factories, load increases, and old or overheating distribution boardsHow: We size the HT, transformer, LT and MDB/SDB, then supply, install and test
Earthing systemBest for: High earth readings, new buildings, shocks from equipment, sensitive electronicsHow: Soil resistivity test, electrode design, earth pits and bonding, proven by measured readings
Lightning & surge protectionBest for: Tall or isolated buildings, rooftop solar or plant, surge-damaged electronicsHow: IEC 62305 risk assessment, air terminals, down conductors, earthing and surge protective devices

From free survey to lifetime support in 5 steps.

One team from the first site visit to the maintenance contract, so nothing falls between contractors.

  1. 01

    Free site survey

    An engineer visits and maps your risks.

  2. 02

    Design & drawing

    NFPA and BNBC 2020-compliant plans, with a written quote.

  3. 03

    Supply & install

    Certified brands, installed by our own team.

  4. 04

    Test & commission

    Full testing, reports and approval support.

  5. 05

    24/7 maintenance

    Scheduled maintenance and emergency call-outs.

Service areas

Electrical & Lightning Safety in Chattogram, Dhaka, Gazipur and Narayanganj.

Our engineers survey, install and maintain on site across these cities and the industrial zones around them. For a site elsewhere in Bangladesh, ask and we will tell you plainly whether we can cover it.

  • Chattogram
  • Dhaka
  • Gazipur
  • Narayanganj

Chattogram office

#28, 1st floor, Diganta Khawja Tower, Bohoddarhat, Chattogram

Open in Maps

Dhaka office

2nd Floor, Alook Tower, Mohakhali, Dhaka-1212

Open in Maps

Electrical & Lightning Safety: questions buyers ask

Yes, in practice. RSC and most buyer electrical audits ask for an up-to-date single line diagram showing every panel, breaker rating and cable size, and auditors check it against what is installed. Without one, overloads and wrong breaker sizes are hard to prove or rule out, so many corrective action plans start with redrawing the SLD.

Earthing gives fault current a safe, low-resistance path to ground so breakers trip and metal parts never stay live. Lightning protection intercepts strikes on the roof and carries them down to earth outside the structure. They are separate designs, but IEC 62305 calls for the lightning earth to be bonded with the building's other earths so dangerous voltage differences cannot build up.

It depends on the connected load, the supply voltage (11 kV or 33 kV), the number of distribution boards and circuits, the switchgear brands specified, and whether existing panels can be reused. Drawings alone cost far less than a sub-station. We give a written, itemized quote after a free site survey, so you can compare it line by line.

BNBC 2020 Part 8 for building electrical services, IEC 60364 for low-voltage installations, IEC 61439 for switchboard assemblies, IEEE 80 for sub-station earthing and IEC 62305 for lightning protection. Where a buyer or insurer names another standard, such as NFPA 70 or NFPA 780, we design to that and state it on the drawings.

Mostly, yes. Surveys, drawings and most earthing work happen while the factory runs. Panel replacement and sub-station changes need short, planned shutdowns, which we schedule for weekends, holidays or night shifts and prepare in advance so the outage covers only the changeover itself. The shutdown plan is agreed in writing before work starts.

Know your building is safe. Book in 60 seconds.

Tell us what you need and where. An engineer confirms your survey slot by phone or WhatsApp.

What happens next

  1. 1

    We call or WhatsApp you to confirm a time.

  2. 2

    An engineer visits and assesses your fire, electrical and security risks.

  3. 3

    You get a written recommendation and quote. No charge, no obligation.

Your details stay private. No newsletters, no sales sequences.

What do you need?

Step 1 of 3

Service needed
Building type Optional

No spam. Your details are used only to arrange the survey.