Inspection, testing and commissioning proves that fire and electrical systems work as designed, using measured results instead of assumptions. It covers acceptance tests for fire alarms, sprinklers, hydrants and pumps, plus electrical tests such as insulation resistance, earth resistance and thermographic scanning. Each test ends with a signed report that auditors and insurers can review.

We test systems we installed and systems other contractors installed. That matters, because a test is only worth something if the tester has no reason to pass a fault. Our engineers use calibrated instruments, follow the method in the relevant standard, and record actual readings, not ticks. Where a system fails, the report says what failed, why it matters and what fixes it. Tests can be booked once, before handover or an audit, or built into a maintenance contract.

At a glance

Standards
NFPA 72, NFPA 20, NFPA 25, NFPA 70B, IEC 60364-6, IEEE 81
Services
Fire system testing & commissioning · Insulation resistance (IR) test · Earth resistance test · Thermographic scan
Where
Chattogram, Dhaka, Gazipur, Narayanganj

Services

Services under Inspection, Testing & Commissioning.

Which test do you need?

Choose by what you need to prove: that a new system works, or that an existing one is still safe.

Fire system testing & commissioningBest for: New or modified fire alarm, sprinkler, hydrant, pump or suppression systemsHow: Witnessed acceptance tests to NFPA 72, 13, 14, 20 and 2001
Insulation resistance (IR) testBest for: Cables, motors and panels before energizing, after flooding, or under auditHow: DC test voltage applied between conductors and earth, readings graded and trended
Earth resistance testBest for: Annual earthing records, new earth pits, sub-stations and lightning systemsHow: Fall-of-potential or clamp-on measurement to IEEE 81, pit by pit
Thermographic scanBest for: Finding loose connections and overloads in live panels without a shutdownHow: Infrared camera survey under load, with graded hot spots and photos

From free survey to lifetime support in 5 steps.

One team from the first site visit to the maintenance contract, so nothing falls between contractors.

  1. 01

    Free site survey

    An engineer visits and maps your risks.

  2. 02

    Design & drawing

    NFPA and BNBC 2020-compliant plans, with a written quote.

  3. 03

    Supply & install

    Certified brands, installed by our own team.

  4. 04

    Test & commission

    Full testing, reports and approval support.

  5. 05

    24/7 maintenance

    Scheduled maintenance and emergency call-outs.

Service areas

Inspection, Testing & Commissioning in Chattogram, Dhaka, Gazipur and Narayanganj.

Our engineers survey, install and maintain on site across these cities and the industrial zones around them. For a site elsewhere in Bangladesh, ask and we will tell you plainly whether we can cover it.

  • Chattogram
  • Dhaka
  • Gazipur
  • Narayanganj

Chattogram office

#28, 1st floor, Diganta Khawja Tower, Bohoddarhat, Chattogram

Open in Maps

Dhaka office

2nd Floor, Alook Tower, Mohakhali, Dhaka-1212

Open in Maps

Inspection, Testing & Commissioning: questions buyers ask

RSC and buyer electrical audits commonly ask for a thermographic scan of panels under load, insulation resistance results for main cables, earth resistance readings for each earth pit, and an up-to-date single line diagram. Reports should be recent and signed, and show actual readings with the location of each test, so every finding can be traced to equipment.

Fire alarms and water-based systems follow the schedules in NFPA 72 and NFPA 25, which range from frequent visual checks to annual tests. Electrical equipment follows NFPA 70B, where intervals depend on condition and how critical the equipment is. A yearly thermographic scan, IR test and earth test is a common baseline for factories.

Yes. We test regardless of who installed the system, and the report measures it against the standard, not against the installer's paperwork. Where drawings or data sheets are missing, we say so. Many clients use us this way before an audit, or before accepting a new building from a contractor.

It depends on which systems are tested, how many devices, panels or earth pits there are, whether tests must happen outside working hours, and how detailed the report must be. Combining several tests in one visit usually costs less than booking them separately. We quote once we have the list of systems.

Know your building is safe. Book in 60 seconds.

Tell us what you need and where. An engineer confirms your survey slot by phone or WhatsApp.

What happens next

  1. 1

    We call or WhatsApp you to confirm a time.

  2. 2

    An engineer visits and assesses your fire, electrical and security risks.

  3. 3

    You get a written recommendation and quote. No charge, no obligation.

Your details stay private. No newsletters, no sales sequences.

What do you need?

Step 1 of 3

Service needed
Building type Optional