An insulation resistance test applies a DC voltage between conductors, and between conductors and earth, to measure how well the insulation stops current leaking. Low readings warn of damp, damaged or aged insulation before it causes a shock, a short circuit or a fire. It is part of initial verification and useful at every maintenance interval.

Quick facts

Standards
IEC 60364-6, IEEE 43, NFPA 70B, BNBC 2020 Part 8
Who needs it
New installations, flooded or damp areas, old cables, motors, transformers and audited factories
What you get
Circuit-by-circuit readings, graded results, trend comparison and recommended action
Instruments
Calibrated insulation resistance tester at the test voltage the equipment needs, thermometer and hygrometer

Scope

What’s included.

Everything below is done by our own engineers and installation team, so one company answers for the result.

  • Phase-to-phase and phase-to-earth tests on main cables
  • Feeder and sub-circuit tests at each distribution board
  • Motor and generator winding tests
  • Transformer winding insulation tests
  • Polarization index on large motors and transformers
  • Temperature and humidity recorded with every reading
  • Comparison with previous results, where available

What does an IR reading actually tell you?

Insulation is never perfect; a tiny current always leaks through it. The tester measures that leakage at a set DC voltage and reports it as resistance, usually in megohms. A high, stable reading means the insulation is dry and sound. A low reading, or one that has fallen sharply since last year, points to moisture, contamination, heat damage or a crushed cable.

A single number says less than people think, because readings change with temperature, humidity and cable length. So we record the conditions, apply temperature correction where the method calls for it, and compare against earlier results. A steady downward trend is often the most useful warning in the whole report.

When is a polarization index test worth doing?

For motors, generators and transformers, a one-minute reading can mislead. The polarization index compares the reading at ten minutes with the reading at one minute. Clean, dry insulation keeps absorbing charge, so its reading rises over time; wet or contaminated insulation stays flat. IEEE 43 describes the test for rotating machines.

It takes longer, so we use it where the equipment justifies the time: large motors driving production lines, fire pump motors, standby generators and distribution transformers. For ordinary building cables, spot readings at the right test voltage, compared year on year, are usually enough.

Why test after flooding or a long shutdown?

Monsoon flooding, roof leaks and a factory standing idle through the Eid holidays all let moisture into cables, motor windings and panels. Switching back on without testing risks a flashover at the worst moment. An IR test before re-energizing shows which circuits are safe, which need drying out and which need replacing.

How it’s done

How we deliver it, step by step.

  1. 01

    Plan the isolation

    Circuits to test marked on the SLD, and the isolation sequence agreed with your electricians.

  2. 02

    Isolate and protect

    Circuits switched off and locked out; drives, SPDs and electronics disconnected to prevent damage.

  3. 03

    Measure

    Readings taken at the right test voltage for each circuit, with temperature and humidity noted.

  4. 04

    Discharge and restore

    Each circuit discharged after testing, connections restored and checked before re-energizing.

  5. 05

    Report and trend

    Results graded and compared with past tests; failing circuits listed with the recommended repair.

Price guide

What sets the price.

Every site is different, so we price from a survey, not a rate card. These are the factors that move the number, and the written quote shows each one.

Get an exact quote
  • Number of circuits, cables, motors and transformers to test
  • Polarization index tests on large equipment
  • Shutdown windows, including night or holiday testing
  • Whether an accurate SLD exists to plan the work
  • Report depth, including trend analysis against earlier results

Service areas

Insulation resistance (IR) test in Chattogram, Dhaka, Gazipur and Narayanganj.

Our engineers survey, install and maintain on site across these cities and the industrial zones around them. For a site elsewhere in Bangladesh, ask and we will tell you plainly whether we can cover it.

  • Chattogram
  • Dhaka
  • Gazipur
  • Narayanganj

Chattogram office

#28, 1st floor, Diganta Khawja Tower, Bohoddarhat, Chattogram

Open in Maps

Dhaka office

2nd Floor, Alook Tower, Mohakhali, Dhaka-1212

Open in Maps

Frequently asked questions

It depends on the equipment, its voltage and the standard being applied. IEC 60364-6 gives minimum values for new low-voltage installations at set test voltages, and IEEE 43 gives guidance for motors and generators. For maintenance, the trend matters as much as the number. Our reports state the acceptance value used for each item.

Yes, for the circuits being tested. The test applies a DC voltage to de-energized conductors, so each circuit must be isolated and locked out. We plan the sequence with your team so only a few circuits are off at a time, or test the whole site during a weekend or holiday shutdown.

At initial verification of any new installation, then at intervals set by condition and criticality, as NFPA 70B recommends. Many factories test main cables and large motors yearly, and again after flooding, a long shutdown or any fault that tripped a breaker. Fire pump motors and other critical equipment deserve closer attention.

It can damage electronics left connected, such as variable speed drives, PLC cards, surge protective devices and LED drivers. That is why we disconnect or bypass them before testing and choose a test voltage suited to each circuit. Cables and motor windings are built to withstand the test voltages used.

Know your building is safe. Book in 60 seconds.

Tell us what you need and where. An engineer confirms your survey slot by phone or WhatsApp.

What happens next

  1. 1

    We call or WhatsApp you to confirm a time.

  2. 2

    An engineer visits and assesses your fire, electrical and security risks.

  3. 3

    You get a written recommendation and quote. No charge, no obligation.

Your details stay private. No newsletters, no sales sequences.

What do you need?

Step 1 of 3

Service needed
Building type Optional

No spam. Your details are used only to arrange the survey.